FACTORY
COATINGS
|
| (a) |
Remove
all loose coating using a knife,scraper or copper headed
hammer. Avoid damage to the pipeline metal. |
| (b) |
Remove all dirt, soil or wash by wire brush or wiping
for at least l5Omm, on both ends of pipe. |
| (c) |
Remove any oil or grease from the p.e. or PVC coating
with xylene (if pipes have plastic coating). |
| (d) |
Lightly abrade p.e. coatings with a wire brush or coarse
abrasive paper. |
| (e) |
Bevel the edges of previous coatings using a heated
scraper to form a 50 mm bevel, if previous coating is thick
coating system(e.g. Coal Tar Enamel coating). |
| METAL |
| (a) |
Remove
any oil or grease with xylene. Remove any metal burrs
and weld spatter. |
| (b) |
Grit blast to meet B54232 2nd quality (SIS55900 Sa
21/2) or wire brush to meet SIS055900 St2 or 3 |
| (c) |
Remove any abrasion debris. |
| (d) |
Apply primer evenly by brush immediately following
the abrasive cleaning. Avoid contamination of the surface
by maintaining an adequate distance between blasting and
priming. |
| PRIMING |
| (a) |
Stir the primer
and transfer to a clean wide-aperture container. Use
only clean dry brushes. |
| (b) |
Apply evenly ensuring complete cover, particularly
around weld beads. |
| (c) |
Let primer dry, to a touch dry condition (check with
knuckles). |
| (d) |
Re-seal containers when not in use. |
| WRAPPING |
| (a) |
Wrapping
should not commence until the primer surface has become
touch dry. The primer surface must be uncontaminated. |
| (b) |
Apply strips of tape l00 mm wide along the weld beads
and press firmly into the bend profile. |
| (c) |
Peel back 15 to 30cm of the release interleave and
apply the tape, adhesive face to the pipe. The angle of
the tape to the pipe must be such as to produce the specified
overlap. Ensure an overlap area of at least 75mm on the
factory coating, and an overlap of 25mm on normal new pipe
coating. |
| (d) |
Apply only sufficient tension to ensure good conformation,avoiding
air pockets and bridging. |
| (e) |
Ensure overlap areas of at least 150mm when splicing
tapes. |
| (f) |
Backfill with care. Avoid use of rocky or agglomerated
backfill or use additional outerwrap protection. |
| GENERAL |
| (a) |
Surface
preparation, priming or wrapping should not take place
when the substrate is wet. Do not carry outwork when
the surface temperature is less than 30C above
the dew point. |
| (b) |
Tapes should be stored at temperatures between 100C and
250C for at least two hours before application
when ambient temperatures are below 100C. |
| (c) |
All sources of ignition must be extinguished or removed
before carrying out priming operations. Adequate ventilation
must also be ensured. |
| (d) |
Store the tapes at temperatures not exceeding 400C and
avoid excessive stacking of loads. |
|
During application it is important
to maintain even tension during the wrapping whilst
controlling the overlap to prevent air entrapment
leading to corrosion at a later stage. The tapes
are best applied by machine, either hand powered
for small runs or mechanically propelled for longer
runs or by hand for joints or small runs. The Pollycote
tapes are normally supplied in 10m lengths for 1500
and in 15m lengths for the others. For machine operations
these lengths are increased to suit the project and
reduce the number of roll changes.
|